A project moves from the design phase to the testing phase. The BA ensures that each test case can be mapped back to a specific functional requirement. This is an example of:
publish date: 2026/03/10 23:19:0.914162 UTC
volume_mute
Correct Answer
Backward Traceability
Explanation
Backward traceability ensures that every test case, design element, or deliverable can be traced back to its originating requirement. It answers the question:
“Why does this test case exist?”
Reference